
Asia Data Growth Stalls as Grids Reach Limit
Asia's data center vacancy fell to 10.9% in 2025. AI workloads need 30kW racks, straining grids beyond current capacity limits.

Asia's data center vacancy fell to 10.9% in 2025. AI workloads need 30kW racks, straining grids beyond current capacity limits.

See how Cloudflare's 500 Tbps budget absorbed a 31.4 Tbps attack in 35 seconds without engineer help, securing global BGP routes.